Installation
1.1 Landing gear installation: install the left and right brace (01), absorb sleeve (02), and screw down the opening (03).

1.2 Align the assembled bracket with the corresponding hole on the fuselage.

1.3 Install the carbon plate under the fuselage (as shown in the figure) and tighten the screws.

The carbon plate is used for mounting payload. accept customized.
- 1.If you have a KUA payload box, it can be installed together with the mounting bracket.
- 2.To avoid the inconvenience of calibration due to the heavy weight of the whole machine after installation, the aircraft can be powered on and calibrated before the arms are assembled.

KUA PAYLOAD DROP SYSTEM FOR MULTI-ROTORS

1.4 Install the 6 arms following the indicated number and tighten the propeller with a screwdriver, as shown in the figure below.


2.1 Connect the 2 unit 25000mAh batteries by series.

2.2 Close the cover and fasten the button.

Last modified 9mo ago